![]() The electrical noise from these sources could cause operational problems for your air conditioner. Install the unit at least 3.3 feet (1.0 m) away from antennas and power or connecting lines that are used for television, radio, home security systems, intercoms, or telephones.Choose a location with studs to ensure the wall is strong enough to hold the weight of the unit.Mount the unit 7 feet (2.1 m) off the floor and ensure there’s at least 6–12 inches (15–30 cm) of open space on every side of the unit to allow for proper airflow. Choose a spot away from direct sunlight and heat sources for the best results. You'll need to cut a hole through the wall to feed the pipes from the indoor unit to the outdoor unit, so make sure the location you choose will allow you to do so. ![]() ![]() Select an unobstructed location on your interior wall to mount the indoor unit. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
January 2023
Categories |